How do you calculate the cost per metre cut?
Add up the hourly cost of the crew and the machine, divide by output in m²/h, then add the tool price divided by the number of metres it will cut. The cost per metre calculator does this automatically.
Knowledge · Costs and retipping
The cost per metre cut is the sum of labour, machine and tool costs divided by output. In most companies the tool is a smaller part of this cost than people's and machines' time – so more metres per tool and fewer changes lower the cost more than a cheaper blade. Retipping the core lowers the cost of the tool itself.
The key points in 30 seconds
Add up the hourly cost of the crew and the machine, divide by output in m²/h, then add the tool price divided by the number of metres it will cut. The cost per metre calculator does this automatically.
Usually faster cutting and longer life. The tool is often less than a third of the cost per metre, so +10% output lowers the cost more than a lower blade price.
When the core is straight, without cracks and with sound segment seats. Retipping costs a fraction of a new blade, and the core goes back to work with new segments.
With good retipping, yes – the new segments come from the same production as those for new tools, and the joint and run-out are checked and recorded in a report.
Change time multiplied by the hourly cost of line or crew downtime, plus the cost of service. With frequent changes this is often more than the cost of the tools themselves.
Brazing or laser, what it costs, when it pays off, and retipping with a bond correction.
People, machine, tool and output.
How to calculate it and how to reduce it.
Comparison test: metres, changes, downtime.
How to calculate and report a closed loop.
Didn't find an answer?